10/08/2026
Use Case | Relocating hardware to a colocation data centre Project stages
Safe Implementation and Quality Assurance
Services provided by Rosenberger OSI
09/21/2026
Fibre-optic plug connectors for data centre cabling Insertion loss, channel insertion loss & transmission capacity
Standards-based requirements for data centre cabling
Optical transceivers, roadmaps and outlook
06/01/2026
Resilient data centre operating models From infrastructure-centric thinking to a data centre operating model
Automation and AI as enablers of resilience
Regulation as a driver for resilient operating models
05/08/2026
Key Takeaways from Data Centre World Frankfurt Fibre Optics That Keeps Up with AI
Maximise Space, Minimise Footprint
Speed & Agility at Hyperscale
05/01/2026
Data Center Event 2026 Budapest September 29, 2026
HUNGEXPO Congress Center
Make an appointment with us on site
04/28/2026
Data centre infrastructure: Ready to meet all needs Creating the necessary technical basis
Future-proof distribution solution
Services from a single supplier
04/14/2026
Avacon implements flexible colocation data centre using infrastructure from Rosenberger OSI The focus of the project was on implementing a flexible cabling solution that can adapt to diverse and often unpredictable customer requirements.
03/30/2026
Why MMC is not a replacement but the perfect complement for hyperscale data centres New connectors such as MMC are not a disruptive one-size-fits-all solution, but complementary building blocks within a scalable fibre-optic ecosystem.
03/10/2026
MMC connectors for high-density fibre optic cabling The high-performance Very Small Form Factor solution has been specifically developed for high-density fibre optic cabling, addressing the increasing demands of modern data centres supporting migrations to 400G, 800G, 1.6TB and 3.2TB.
02/24/2026
The Strategic Triangle of Data Centres: Sovereignty, Speed and Sustainability Handover of the installed infrastructure to the operations team
Provision of documentation for operating personnel
Establishment of long-term maintenance and service plans
02/05/2026
Successfully commissioning data centers: From project to operational readiness Handover of the installed infrastructure to the operations team
Provision of documentation for operating personnel
Establishment of long-term maintenance and service plans
01/22/2026
Data centres consolidation for leading global optics groupPreCONNECT® SMAP-G2 UHD is designed to support the growing power densities and flexibility requirements of modern data centres.










